• Wirra Wirra

Wirra Wirra

The Challenge:

To install a new refrigeration plant, as a key component of a major upgrade of the winery’s energy systems . Cold Logic had been approached by Wirra Wirra, after the winery’s energy prices had doubled between 2008 and 2013. Cold Logic installed a new high efficiency ammonia refrigeration plant to cater for a planned 2500 tonne grape crush.

The Outcome:

Wirra Wirra’s CEO, Mr Andrew Kay, said the energy and maintenance savings from the new refrigeration plant alone was worth nearly $25,000 a year.
"The new high efficient ammonia refrigeration plant, together with upgraded brine lines and solar panels, had delivered savings of nearly 50% from Wirra Wirra’s annual energy bill,”.

Back to Case Studies

Contact Us / Adelaide

Head Office
24 Francis Street, Port Adelaide South Australia 5015
PO Box 74, Port Adelaide
Telephone 08 8240 3333
solutions@coldlogic.com.au

Other Locations
Contact Us