TheChallenge: 4Pines needed more chilling power to cope with the increasing demand of theirproduct. They needed the new system to be designed and installed in theexisting brewery with energy efficiency in the forefront of the design. The Outcome: The solution was Cold Logic designed and installed a 150kWR chiller – designed and assembled at Cold […]
Continue reading