TheChallenge: Todesign and construct a new Ammonia based refrigeration plant to reduce energyconsumption. The winery with a capacityof 10,000 tonnes, consisted of a 400kW and 1000kW air cooled chillers on Freonrefrigerant. TheOutcome: Since constructing the plant, significantpower savings have been realised. The total power savings for the refrigerationplant was more than 39% and demonstrated the […]