Long term trust in Cold Logic Port Lincoln Tuna Processors haveentrusted their refrigeration design, installation and service to Cold Logicfor over 25 years. Through their years of growth, Cold Logic has been anintegral part of their operation. PortLincoln Tuna Processors recent approached Cold Logic about additional capacityrequirements and upgrade to their refrigeration plant which Cold […]
Continue reading
The Challenge: Installation of a new ice tank along with 3 chilled water pumps and a chilled water buffer tank in order to increase the capacity of the chilled water. To other challenge was to use the existing refrigeration plant to supply the new upgraded ice bank and increase pump capacities on site. The Outcome: […]
Continue reading
The Challenge: To install a customised system to cool the desalinated water being supplied to Sundrop Farms’ landmark greenhouse project. The 20-hectare project harvests solar power to generate energy for desalination to supply hydroponic greenhouses. The plant uses solar energy generated to super-heat sea water to steam, generating power from the condensate. The ammonia refrigeration […]
Continue reading
The Challenge: This project involved finding a leading cooling solution for the barrel stores and warehouse using leading edge efficiency. The key criteria for Peter Lehmanns was to ensure effective temperature control with ideal humidity for barrel storage. The Outcome: The solution was a series of Climate Wizard units to achieve hyper efficient cooling to […]
Continue reading
The Challenge: To establish cool rooms and temperature controlled warehouses at the new market site in Epping, which became operational in August 2015. The new market is one of the largest infrastructure projects in Victoria and is located on 70 hectares of land close to the Tullamarine airport. The Outcome: The Melbourne Market is crucial […]
Continue reading
Challenge: Thomas Foods (formally T&R Pastoral), operated a processing facility in Murray Bridge, SA which was expanding to meet production demands. This presented significant problems, particularly in that upgrades needed to be made while keeping the operation and refrigeration running. Outcome: Cold Logic worked extremely hard for many years to provide the latest refrigeration technologies […]
Continue reading
Challenge: Pirate Life Brewing wanted to increase their total production to 11 million litres per year using the most energy efficient system possible and with the capacity for expansion in the next few years. The Outcome: The 400kW refrigeration plant – designed and assembled at Cold Logic’s nearby Port Adelaide factory – consists of compressors, […]
Continue reading
The Challenge: Chilled water is continuously used throughout the day and night as part of the malting process. The key challenge was to design a system that can cope with peak loads during hot weather with 100% production rates but also cater to reduce heat loads on cold ambient days. The Outcome: The plant is […]