TheChallenge: Upgrade the refrigeration plant to provide additional capacity and redundancy for the beef carcass chillers. This project had to completed in a tight time frame all around live operation with no downtime to processing. This project included 2 additional screw compressor packages, new accumulator, electrical upgrade, new evaporative condenser and NH3 receiver. This is […]
Continue reading
Completed Projects for Pernod Ricard Morris (NSW) New Refrigeration Plant (Brine) – 170kW Richmond Grove (SA) New Refrigeration Plant (Ammonia/Brine) – 2130kW Rowland Flat (SA) New Refrigeration Plant (Ammonia/Brine) – 3800kW Wickham Hill (NSW) New Refrigeration Plant (Ammonia/Brine) – 1400kW Montrose (NSW) New Refrigeration Plant (Ammonia/Brine) – 500kW
Continue reading
TheChallenge: LittleCreatures built a new brewery in Geelong, Vic to cater for increased demand.They needed a refrigeration plant to cope with the required demand now andallow for future expansion. This projectwas completed via Krones. TheOutcome: Thesolution was a Cold Logic design and installed 740kW ammonia refrigerationplant to chill glycol. The plant was sized for the […]
Continue reading
The Challenge: Rand Refrigerated Logistics required a new Greenfields distribution centre to built in Derrimut Vic. Cold Logic work with Rand and project builder, CMW Design & Construct to develop a first class Ammonia refrigeration plant. The Outcome: Cold Logic provided a full design and construct solution for both chilled and freezer rooms operating between […]
Continue reading
The Challenge: Brewpack is a 100% independently owned Australian contract beverage manufacturer. In March 2018 they re-branded and announced a new facility to be built in Smeaton, NSW. They needed a new plant with a 1125 kW capacity using a combination of ammonia and glycol refrigerants. They needed a system robust enough to cope with […]
Continue reading
TheChallenge: 4Pines needed more chilling power to cope with the increasing demand of theirproduct. They needed the new system to be designed and installed in theexisting brewery with energy efficiency in the forefront of the design. The Outcome: The solution was Cold Logic designed and installed a 150kWR chiller – designed and assembled at Cold […]
Continue reading
TheChallenge: Cold Logic was the successful tendererfor the refrigeration design and fit-out and installed a custom-designedammonia refrigeration plant during the construction of the facility. The systemhas been operational since early 2014 and met and exceeded the givenrequirements for reliability and performance. In 2016, Cold Logic was again approachedby Angelo Lamattina witha request for a proposal […]
Continue reading
TheChallenge:Toinstall a new refrigeration plant, as a key component of a major upgrade of thewinery’s energy systems . Cold Logic had been approached by Wirra Wirra,after the winery’s energy prices had doubled between 2008 and 2013. Cold Logicinstalled a new high efficiency ammonia refrigeration plant to cater for aplanned 2500 tonne grape crush. The Outcome: […]
Continue reading
Challenge: Haigh’s Chocolates expansion of their Mile End site has required a state of the art refrigeration solution. This was to provide hot and cold water to several stages of the new chocolate processing plant as well as cooling and ventilation of various rooms throughout the factory. The solution was to be highly efficient, using […]
Continue reading
The Challenge: Rand Refrigerated Logistics expands its operations and sough to establish a new distribution centre in Parkinson, Queensland for both short and long term cold storage. The Outcome: Cold Logic provided a full design and construct solution for both chilled and freezer rooms operating between -25°C and +2°C on ammonia refrigerant. This project was […]
Continue reading