Saizeriya and Cold Logic

Saizeriya – Melton

  • 2019-10-17

The Challenge: Japanese catering giant Saizeriya commissioned this building to house its food processing operations where food is prepared in Australia then shipped to Japan as pre-packaged restaurant meals.  The facility consists of processing and storage, a massive freezer.  The Outcome: Cold Logic designed and constructed the refrigeration plant, consisting of 8 x screw compressors, […]

Continue reading
Frew Group Australia

Frew Group

  • 2019-09-20

Challenge: Frew Trading Pty Ltd has supplied the Australian market with quality wholesale meat products for over 30 years. Cold Logic installed a NH3 refrigeration plant at Frew Trading processing site in Wingfield in 1999. Cold had also been involved with Frewstal in Stawell since 1994. Outcome:  Cold Logic have made substantial upgrades for Frew […]

Continue reading
Teys Australia and Cold Logic

TEYS Australia

  • 2019-09-20

The Challenge: Upgrade the refrigeration plant to provide additional capacity and redundancy for the beef  carcass chillers. This project had to completed in a tight time frame all around live operation with no downtime to processing. This project included 2 additional screw compressor packages, new accumulator, electrical upgrade, new evaporative condenser and NH3 receiver. This […]

Continue reading

Rocky Lamattina & Sons

  • 2019-08-13

The Challenge: Cold Logic was the successful tenderer for the refrigeration design and fit-out and installed a custom-designed ammonia refrigeration plant during the construction of the facility. The system has been operational since early 2014 and met and exceeded the given requirements for reliability and performance. In 2016, Cold Logic was again approached by Angelo […]

Continue reading

Haigh’s Chocolates

  • 2019-05-21

Challenge: Haigh’s Chocolates expansion of their Mile End site has required a state of the art refrigeration solution. This was to provide hot and cold water to several stages of the new chocolate processing plant as well as cooling and ventilation of various rooms throughout the factory.  The solution was to be highly efficient, using […]

Continue reading

Haigh’s Store A/C and HVAC

  • 2019-05-21

The Challenge: Haigh’s needed a strong refrigeration service agent to provide ongoing preventative maintenance to their 11 stores across SA and Victoria and their commercial head office in Parkside. Temperature control of the retail outlets and its chocolate stocks was critical. Cold Logic was selected for its professional and rapid response times, electronic reporting and […]

Continue reading

Woolworths

  • 2019-05-21

Gepps Cross, Adelaide (SA) This project involves the supply and installation of temperature control and refrigeration services for the expansion of the original Woolworths distribution facility at Gepps Cross in Adelaide. The expansion added an additional 14,000 square metres of refrigerated and humidity controlled space. Larapinta, Brisbane (Qld) This project involves the supply and installation […]

Continue reading

TFI – Australia’s First Heat Pump

  • 2019-05-21

Cold Logic is committed to being at the forefront of refrigeration technology – bringing together the leading products from suppliers across the globe with expert local refrigeration design and engineering experience in all facets of applications. Cold Logic has installed Australia’s first Ammonia Heat Pump (AHP) at Thomas Foods International (TFI) that turns waste heat […]

Continue reading

Port Lincoln Tuna Processors

  • 2019-05-20

Long term trust in Cold Logic Port Lincoln Tuna Processors have entrusted their refrigeration design, installation and service to Cold Logic for over 25 years. Through their years of growth, Cold Logic has been an integral part of their operation. Port Lincoln Tuna Processors recent approached Cold Logic about additional capacity requirements and upgrade to […]

Continue reading

Yakult

  • 2019-05-20

The Challenge: Installation of a new ice tank along with 3 chilled water pumps and a chilled water buffer tank in order to increase the capacity of the chilled water. To other challenge was to use the existing refrigeration plant to supply the new upgraded ice bank and increase pump capacities on site. The Outcome:  […]

Continue reading