Saizeriya and Cold Logic

Saizeriya – Melton

  • 2019-10-17

The Challenge: Japanese catering giant Saizeriya commissioned this building to house its food processing operations where food is prepared in Australia then shipped to Japan as pre-packaged restaurant meals.  The facility consists of processing and storage, a massive freezer.  The Outcome: Cold Logic designed and constructed the refrigeration plant, consisting of 8 x screw compressors, […]

Continue reading
Rainfresh and Cold Logic

Rainfresh

  • 2019-10-17

The Challenge:  Rainfresh P/L is a major wholesaler of quality fresh fruit and vegetables, nuts, cut flowers, seedlings and water in Victoria. Our challenge was to design a refrigerated warehouse. We designed a system based a common propylene glycol system with a single Air cooled chiller, 3,000 litre insulated buffer tank, duty and standby glycol […]

Continue reading

Little Creatures Brewing

  • 2019-09-20

The Challenge:  Little Creatures built a new brewery in Geelong, Vic to cater for increased demand. They needed a refrigeration plant to cope with the required demand now and allow for future expansion.  This project was completed via Krones. The Outcome: The solution was a Cold Logic design and installed 740kW ammonia refrigeration plant to […]

Continue reading

Rand Refrigeration Logistics

  • 2019-09-20

The Challenge:  Rand  Refrigerated Logistics required a new Greenfields distribution centre to built in Derrimut Vic. Cold Logic work with Rand and project builder, CMW Design & Construct to develop a first class Ammonia refrigeration plant. The Outcome:  Cold Logic  provided a full design and construct solution for both chilled and freezer rooms operating between […]

Continue reading

Rocky Lamattina & Sons

  • 2019-08-13

The Challenge: Cold Logic was the successful tenderer for the refrigeration design and fit-out and installed a custom-designed ammonia refrigeration plant during the construction of the facility. The system has been operational since early 2014 and met and exceeded the given requirements for reliability and performance. In 2016, Cold Logic was again approached by Angelo […]

Continue reading
Aldi distribution warehouse and Cold Logic

Aldi Distribution Centres

  • 2019-06-06

The Challenge: Cold Logic was given the opportunity to take over the preventive maintenance on Two sites in Victoria, Dandenong and Derrimut following the successful Cold Logic installation of the ammonia refrigeration plant at Derrimut. Aldi’s  challenge was that they had reoccurring issues with their existing plant. The Outcome: Cold Logic developed monthly maintenance plans […]

Continue reading

Haigh’s Store A/C and HVAC

  • 2019-05-21

The Challenge: Haigh’s needed a strong refrigeration service agent to provide ongoing preventative maintenance to their 11 stores across SA and Victoria and their commercial head office in Parkside. Temperature control of the retail outlets and its chocolate stocks was critical. Cold Logic was selected for its professional and rapid response times, electronic reporting and […]

Continue reading

API

  • 2019-05-21

The Challenge:  API is one of Australia’s largest Pharmaceutical groups distributing a vast array of critical medical supplies through its retail group Priceline & Soul Pattinson. The Solution: Cold Logic have provided a national solution for API with design, installation and servicing of cool rooms with full redundancy for backup in case of equipment failure. […]

Continue reading

Boeing

  • 2019-05-20

Cold Logic has been the refrigeration service provider at Boeing’s facility in Port Melbourne for over 10 years. Cold Logic maintains and services the fridges and freezers that are mission critical to the composite manufacturing processes that Boeing undertakes as part of their aero structure business. The refrigeration systems are used to regulate and maintain […]

Continue reading

Yakult

  • 2019-05-20

The Challenge: Installation of a new ice tank along with 3 chilled water pumps and a chilled water buffer tank in order to increase the capacity of the chilled water. To other challenge was to use the existing refrigeration plant to supply the new upgraded ice bank and increase pump capacities on site. The Outcome:  […]

Continue reading